Volt Co generates and sells electricity. It operates two types of power station: nuclear and wind.

The costs and output of the two types of power station are detailed below:

Nuclear station

A nuclear station can generate 9,000 gigawatts of electricity in each of its 40 years of useful life. Operating costs are $486m 

per year. Operating costs include a provision for depreciation of $175m per year to recover the $7,000m cost of building 

the power station.

Each nuclear station has an estimated decommissioning cost of $12,000m at the end of its life. The decommissioning cost relates to the cost of safely disposing of spent nuclear fuel.

Wind station

A wind station can generate 1,750 gigawatts of electricity per year. It has a life-cycle cost of $55,000 per gigawatt and an 

average operating cost of $40,000 per gigawatt over its 20-year life.

16 What is the life-cycle cost per gigawatt of the nuclear station (to the nearest $’000)?

A $54,000

B $73,000

C $87,000

D $107,000

17 Which of the following will decrease the total life-cycle cost of a nuclear station?

(1) Increasing the useful life of the station

(2) Reducing the decommissioning cost

A 1 only

B 2 only

C Both 1 and 2

D Neither 1 nor 2

18 How would the disposal cost of spent nuclear fuel be categorised in environmental management accounting (EMA)?

A A prevention cost

B A detection cost

C An internal failure cost

D An external failure cost

19 If Volt Co sets a price to earn an operating margin of 40% over the life of a wind station, what will be the total lifetime profit per station (to the nearest $m)?

A $35m

B $408m

C $560m

D $933m

20 Which of the following are benefits of life-cycle costing for Volt Co?

(1) It facilitates the designing out of costs at the product development stage

(2) It can encourage better control of operating costs over the life cycle

(3) It gives a better understanding of the causes of overhead costs

(4) It provides useful data for short-term decision-making

A 1, 2 and 3

B 1 and 2 only

C 1 and 4

D 2, 3 and 4

前往ACCA学习专区下载历年试题及答案解析>>

为了帮助备考ACCA考试的小伙伴们高效学习,正保会计网校为大家提供诸多班次以及专业师资,帮助大家尽早拿下ACCA:

点击查看2021年ACCA新课,早买更优惠>>

免费试听

  • Jessie《FR 财务报告》

    Jessie主讲:《FR 财务报告》免费听

  • 张宏远《MA 管理会计》

    张宏远主讲:《MA 管理会计》免费听

  • 何 文《SBL 战略商业领袖》

    何 文主讲:《SBL 战略商业领袖》免费听

限时免费资料

  • 近10年A考汇总

    历年样卷

  • 最新官方考试大纲

    考试大纲

  • 各科目专业词汇表

    词汇表

  • ACCA考试报考指南

    报考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串讲直播

    思维导图

回到顶部
折叠
网站地图

Copyright © 2000 - www.chinaacc.com All Rights Reserved. 北京东大正保科技有限公司 版权所有

京ICP证030467号 京ICP证030467号-1 出版物经营许可证 京公网安备 11010802023314号

正保会计网校